Table 64. Environmental requirements (continued)
Environment
Allowable
operating
Nonoperating
(system off)
Nonoperating
(storage)
Nonoperating
(shipping)
Temperature
5°C - 40°C (41°F -
104°F) at 0 - 950 m
(0 - 3117 ft)
Decrease maximum
system temperature
by 1°C for every 175
m (574 ft) above
950 m (3117 ft).
5°C - 28°C (41°F -
82°F) at 3050 m
(10000 ft)
5°C - 45°C (41°F -
113°F)
1°C - 60°C (33.8°F -
140.0°F)
-40°C to 60°C
(-40°F to 140°F)
Humidity range
Non-condensing:
-12.0°C (10.4°F)
dew point
Relative humidity
(RH): 8% - 85%
8% - 85% RH
5% to 80% RH
5% - 100% RH
Maximum dew point 24°C (75°F)
27°C (80.6°F)
29°C (84.2°F)
29°C (84.2°F)
Maximum altitude
3050 m (10000 ft)
3050 m (10000 ft)
3050 m (10000 ft)
10700 m (35105 ft)
Table 65. Noise emissions (Maximum configuration)
1
Acoustical characteristics
Idling
Operating
L
WAd
6.1 bels
6.1 bels
1. The noise emission level that is stated is the declared (upper limit) sound power level, in bels, for a random
sample of servers. All measurements are made in accordance with ISO 7779 and reported in conformance
with ISO 9296.
7063-CR1 Hardware Management Console specifications
Hardware specifications for model 7063-CR1 provide detailed information for your Hardware
Management Console (HMC), including dimensions, electrical, power, temperature, environmental
specifications, and noise emissions.
The HMC controls managed systems, including the management of logical partitions and the use of
capacity on demand. Using service applications, the HMC communicates with managed systems to
detect, consolidate, and send information to IBM for analysis. The HMC provides service technicians with
diagnostic information for systems that can operate in a multiple-partitioned environment.
Use the following specifications to plan for your HMC.
Table 66. Dimensions
Width
Depth
Height
Weight
437 mm (17.2 in.)
705.3 mm (27.76 in.)
43.0 mm (1.7 in.)
14.5 kg (32 lb)
Site and hardware planning 65
Summary of Contents for 9008-22L
Page 1: ...Power Systems Site and hardware planning IBM...
Page 4: ...iv...
Page 14: ...xiv Power Systems Site and hardware planning...
Page 16: ...2 Power Systems Site and hardware planning...
Page 20: ...6 Power Systems Site and hardware planning...
Page 40: ...Figure 1 FC EPB8 power distribution panel 26 Power Systems Site and hardware planning...
Page 49: ...Figure 5 FC ERG0 rear rack extender top down view Site and hardware planning 35...
Page 123: ...Figure 35 Cable management bridge lances Site and hardware planning 109...
Page 163: ......
Page 164: ...IBM...