Related concepts
Supported PDU power cords
Find out which power distribution unit (PDU) power cords are supported for your system.
Planning for cables
Learn how to develop plans for cabling your server and devices.
Cable management
These guidelines ensure that your system and its cables have optimal clearance for maintenance and
other operations. The guidelines also provide guidance in correctly cabling your system and using the
appropriate cables.
The following guidelines provide cabling information for installing, migrating, relocating, or upgrading your
system:
• Position drawers in racks to allow enough space, where possible, for cable routing on the bottom and
top of the rack, and between drawers.
• Shorter drawers must not be placed between longer drawers in the rack (for example, placing a 19-inch
drawer between two 24-inch drawers).
• When a specific cable plugging sequence is required, for example, for concurrent maintenance
(symmetric multiprocessing cables), label the cables and note the sequence order.
• To facilitate cable routing, install cables in the following order:
Site and hardware planning 107
Summary of Contents for 9008-22L
Page 1: ...Power Systems Site and hardware planning IBM...
Page 4: ...iv...
Page 14: ...xiv Power Systems Site and hardware planning...
Page 16: ...2 Power Systems Site and hardware planning...
Page 20: ...6 Power Systems Site and hardware planning...
Page 40: ...Figure 1 FC EPB8 power distribution panel 26 Power Systems Site and hardware planning...
Page 49: ...Figure 5 FC ERG0 rear rack extender top down view Site and hardware planning 35...
Page 123: ...Figure 35 Cable management bridge lances Site and hardware planning 109...
Page 163: ......
Page 164: ...IBM...