3746-900 and service processor installation
Configuring NetView Performance Monitor (NPM)
1. ____ Double click on the 3746-9x0 icon where you installed APPN feature.
2. ____ From the 3746-9x0 menu, click on Network Node Processor (NNP)
Management.
Figure 2-46. 3746-9x0 Menu
3. ____ Double click on Manage Control Points on NNPs.
Figure
2-47. Network Node Processor Menu
4. ____ Select the network node processor A (or B) , then click on Manage NPM.
Figure
2-48. Manage Control Points on NNP
Chapter 2. Connecting the 3746-900 to the Power and Devices
2-43
Summary of Contents for 3746-900
Page 1: ...3746 Nways Multiprotocol Controller Model 900 IBM Installation Guide SY33 2114 03...
Page 2: ......
Page 3: ...3746 Nways Multiprotocol Controller Model 900 IBM Installation Guide SY33 2114 03...
Page 14: ...xii 3746 900 Installation Guide...
Page 17: ...Notices xv...
Page 20: ...7 Power ON indicator 8 Emergency power OFF xviii 3746 900 Installation Guide...
Page 24: ...xxii 3746 900 Installation Guide...
Page 26: ...xxiv 3746 900 Installation Guide...
Page 40: ...3746 900 preparing for installation 1 14 3746 900 Installation Guide...
Page 102: ...3746 900 Test Procedure 3 14 3746 900 Installation Guide...
Page 146: ...Cabling the 3746 900 to the 3745 X1A 4 44 3746 900 Installation Guide...
Page 168: ...3745 Test Procedures 7 6 3746 900 Installation Guide...
Page 198: ...3746 900 Ground Bracket Installation 9 6 3746 900 Installation Guide...
Page 204: ...3746 900 Attached to a 3745 17A Ground Bracket Installation 10 6 3746 900 Installation Guide...
Page 210: ...Machine Ready for Customer 11 6 3746 900 Installation Guide...
Page 218: ...Removal the 3746 900 Attached to a 3745 17A 13 4 3746 900 Installation Guide...
Page 220: ...A 2 3746 900 Installation Guide...
Page 250: ...E 14 3746 900 Installation Guide...
Page 268: ...X 18 3746 900 Installation Guide...
Page 272: ......
Page 275: ......
Page 276: ...IBM Part Number 29H4858 Printed in Denmark by IBM Danmark A S 29H4858 SY33 2114 3...