3746-900 and service processor installation
bridge should be lit, the green status on each attachment module.
should be lit, and the green status LED should be lit.
f. ____ If any number is still displayed, or if any yellow LED is lit, refer
to
8229 Bridge Manual, GA27-4025, chapter 'Problem Determination
and Servicing'.
Go to step 5.
Step
5. Setting up the Ethernet Bridge
a. ____ On the service processor, double click on the "Service
Processor object icon".
b. ____ Click on "Manage Ethernet Bridge".
Figure
2-13. Managing the Ethernet Bridge
Note: If the Ethernet Bridge has been already configured, go to step
5c , otherwise go to step 5d on page 2-13 .
c. ____ Double click on Restore LLC2 Network Management
(TREE.X)
Figure
2-14. Restoring LLC2 Code
1) ____ Locate the first MAC address on top of the label on the front
of the ethernet bridge (to the left of the reset button). See
Figure 2-11 on page 2-10 for a view of the ethernet bridge front
panel.
2-12
3746-900: Installation Guide
Summary of Contents for 3746-900
Page 1: ...3746 Nways Multiprotocol Controller Model 900 IBM Installation Guide SY33 2114 03...
Page 2: ......
Page 3: ...3746 Nways Multiprotocol Controller Model 900 IBM Installation Guide SY33 2114 03...
Page 14: ...xii 3746 900 Installation Guide...
Page 17: ...Notices xv...
Page 20: ...7 Power ON indicator 8 Emergency power OFF xviii 3746 900 Installation Guide...
Page 24: ...xxii 3746 900 Installation Guide...
Page 26: ...xxiv 3746 900 Installation Guide...
Page 40: ...3746 900 preparing for installation 1 14 3746 900 Installation Guide...
Page 102: ...3746 900 Test Procedure 3 14 3746 900 Installation Guide...
Page 146: ...Cabling the 3746 900 to the 3745 X1A 4 44 3746 900 Installation Guide...
Page 168: ...3745 Test Procedures 7 6 3746 900 Installation Guide...
Page 198: ...3746 900 Ground Bracket Installation 9 6 3746 900 Installation Guide...
Page 204: ...3746 900 Attached to a 3745 17A Ground Bracket Installation 10 6 3746 900 Installation Guide...
Page 210: ...Machine Ready for Customer 11 6 3746 900 Installation Guide...
Page 218: ...Removal the 3746 900 Attached to a 3745 17A 13 4 3746 900 Installation Guide...
Page 220: ...A 2 3746 900 Installation Guide...
Page 250: ...E 14 3746 900 Installation Guide...
Page 268: ...X 18 3746 900 Installation Guide...
Page 272: ......
Page 275: ......
Page 276: ...IBM Part Number 29H4858 Printed in Denmark by IBM Danmark A S 29H4858 SY33 2114 3...