8-3
8. Maintenan
ce and Inspection
8.2 Inspection items and schedule
Follow the maintenance inspection schedule below.
It is assumed that the equipment is operating 8 hours per day.
If the equipment is running continuously night and day or otherwise running at a high operating
rate, inspect more often.
Rod type, table type
Inspection period
External
inspection
Internal
inspection
Greasing
Start of work inspection
○
-
-
1-month inspection
○
-
-
3-month inspection
-
-
○
6-month inspection
○
○
Depends on grease supply
timing (guideline)
Every 6 months thereafter
○
○
Grease supply timing (Guideline)
Maximum operating speed [mm/s]
Grease supply timing (Guideline)
Travel distance
Months
0 to 300 or less
1,250km
12 months
8.2 Inspection items and schedule
Summary of Contents for EC ELECYLINDER EC-GD4
Page 28: ...Intro 21 ...
Page 32: ...1 3 1 Specifications Product list Rod type Table type 1 1 Checking the product ...
Page 60: ...1 31 1 Specifications ...
Page 126: ...4 21 4 Operation ...
Page 148: ...6 15 6 Parameters ...
Page 198: ...11 3 11 Warranty ...
Page 199: ...Appendix 12 1 Index 12 1 12 2 Revision history 12 5 ELECYLINDER Chapter12 ...
Page 206: ......
Page 207: ......