
4. Appendix
197
[14] In the “Assign Connection” dialog box, set as follows and click the [Register] button.
Confirm that the values in the “Target Device” area match those set in step [5].
[15] When the registration in “Assign Connection” is complete, the “Assign Connection” dialog box opens again.
Click the [Close] button to close the dialog box.
[16] In the “Edit Device Parameters” dialog box, click the [OK] button.
Click the [Download to Network] button on the toolbar to start writing the parameters to the PLC, after which
the PLC is restarted. Wait for several seconds, and link will be established between the PLC and controller.
Summary of Contents for acon
Page 1: ...EtherNet IP IAI America Inc Operation Manual Second Edition ACON PCON SCON CA ...
Page 2: ......
Page 4: ......
Page 197: ...4 Appendix 191 PLC s IP Address Controller s IP Address ...
Page 214: ......
Page 215: ......