Inst
allati
on
Installation
EcoSift
Operator Manual
809500
147
Install the EcoSift unit
Parts, tools, and materials
Recommended materials
Make sure all fasteners and connections are tight. The EcoSift unit vibrates.
Forklift or crane
Level (no longer than 60.96 cm/24 inches)
Full set of standard open-ended wrenches,
sockets, nut drivers, and screwdrivers
Electrician’s fish tape (draw tape)
Measuring tape
14 mm open-ended wrench
Ladder
Full set of metric hex key wrenches
PTFE tape or thread sealant
2 adjustable wrenches
Epoxy
Pliers or knife
2 sections of threaded rod, no larger
than 19 mm (3/4 inch) in diameter
Saw
Hammer drill
Nuts to fit the threaded rod
Heat gun
Silicone lubricant
Light penetrating oil
Summary of Contents for EcoSift
Page 1: ...EcoSift Waterjet abrasive recycling system Operator Manual 809500 Revision 0 English ...
Page 12: ...SC 12 Safety and compliance Product stewardship Product stewardship Declaration of conformity ...
Page 14: ...SC 14 Safety and compliance Product stewardship Product stewardship ...
Page 16: ...SC 16 Safety and compliance Environmental stewardship Environmental stewardship ...
Page 32: ...Terminology Terminology 32 EcoSift Operator Manual 809500 ...
Page 40: ...Product description Product description 40 EcoSift Operator Manual 809500 ...
Page 42: ...Options Options 42 EcoSift Operator Manual 809500 ...
Page 132: ...Troubleshooting Troubleshooting 132 EcoSift Operator Manual 809500 ...
Page 136: ...Specifications Specifications 136 EcoSift Operator Manual 809500 ...
Page 172: ...Installation Installation 172 EcoSift Operator Manual 809500 ...
Page 174: ...Technical drawings Technical drawings 174 EcoSift Operator Manual 809500 ...