![Hypertherm EcoSift Operator'S Manual Download Page 104](http://html1.mh-extra.com/html/hypertherm/ecosift/ecosift_operators-manual_2193780104.webp)
Preventive maintenance
Preventive main
tenance
104
EcoSift
Operator Manual
809500
6.
Replace the pilot spool.
7.
Replace the snap ring on each side of the center section.
8.
Use two 3/4-inch wrenches to assemble the center section.
Lubricate the shaft with NLGI grade 2 white EP bearing grease.
To tighten the outer pistons, turn them in opposite directions at the same time. Torque the outer pistons and
the diaphragms to 3.40 N∙m (30 lbf∙in).
1
1
3
3
2
4
2
5
1
Outer piston
2
Diaphragm
3
Inner piston
4
Center section
5
Shaft
Summary of Contents for EcoSift
Page 1: ...EcoSift Waterjet abrasive recycling system Operator Manual 809500 Revision 0 English ...
Page 12: ...SC 12 Safety and compliance Product stewardship Product stewardship Declaration of conformity ...
Page 14: ...SC 14 Safety and compliance Product stewardship Product stewardship ...
Page 16: ...SC 16 Safety and compliance Environmental stewardship Environmental stewardship ...
Page 32: ...Terminology Terminology 32 EcoSift Operator Manual 809500 ...
Page 40: ...Product description Product description 40 EcoSift Operator Manual 809500 ...
Page 42: ...Options Options 42 EcoSift Operator Manual 809500 ...
Page 132: ...Troubleshooting Troubleshooting 132 EcoSift Operator Manual 809500 ...
Page 136: ...Specifications Specifications 136 EcoSift Operator Manual 809500 ...
Page 172: ...Installation Installation 172 EcoSift Operator Manual 809500 ...
Page 174: ...Technical drawings Technical drawings 174 EcoSift Operator Manual 809500 ...