Machine installation
"
Insert the plug in the socket, ensuring that the mains voltage is the same as
that for which the machine has been setup.
VOLT ?
VOLT ?
"
Power up machine by rotating the main switch located on the right side of the
control panel (The STAND BY LED lights up).
Check that the motor is rotating in the correct direction. For this check the
following operations must be carried out:
"
set the blade tension to 70 BAR;
"
make sure the cover is properly closed: at the back of the cutting head there is
a bayonet limiter for correct cover closure;
"
make sure that the machine is not in an emergency condition (red mush-
room---head pushbutton released);
"
select a cutting speed using the polarity change switch;
Summary of Contents for PH 211
Page 1: ...EN YEAR OF MANUFACTURE ______________ PH 211 USE AND MAINTENANCE MANUAL ...
Page 2: ......
Page 6: ......
Page 40: ...6 2 34 Use and maintenance manual PH211 Standardised Wiring Diagrams HB single phase ...
Page 41: ...6 3 35 Diagrams exploded views and replace Standardised Wiring Diagrams three phase ...
Page 44: ...6 6 38 Use and maintenance manual PH211 Motor assembly Handle assembly ...
Page 50: ...6 12 44 Use and maintenance manual PH211 Control panel assembly ...
Page 52: ...6 14 46 Use and maintenance manual PH211 Base assembly ...
Page 54: ...6 16 48 Use and maintenance manual PH211 Vise assembly A Vise assembly B PH 211 ...
Page 56: ...6 18 50 Use and maintenance manual PH211 Stand leg assembly ...
Page 58: ......
Page 72: ......
Page 97: ......
Page 98: ......