Reach-In
P/N 3053328_C
1-3
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
NOTE:
B
egin
lineup
leveling
from
the
highest
point
of
the
store
floor
.
Place shims under the rail and make sure that they
are positioned at a base component (crossbar). This
transfers the weight directly from the loaded case
through to the floor.
Placing shims at other locations will cause uneven
distribution of weight leading to piping leaks, as well
as sagging or wracked doors.
Bottom front supports must be shimmed if not in full
contact with the floor.
Front
Back
Base Component
Shim Here
Shim Here
Shim Here
It is the installing contractor’s
responsibility to consult local agencies
for local code requirements.
4-Door Shown
Approximately
Centered
Rear of Reach-in
Base Component
Shim
Here
Back
Skid/External Base
Bottom Front
Support
Front
Electrical Wireway