Table of Contents
ANSI Z535.5 DEFINITIONS
...................v
INSTALLATION TOOL LIST
................v
INSTALLATION
UL Listing ..................................................... 1-1
Federal / State Regulations. ............................. 1-1
Location ....................................................... 1-1
Shipping Damage ........................................... 1-1
Exterior Loading ........................................... 1-2
Merchandisers Shipped With End Installed ......... 1-2
Shipping Braces ............................................. 1-2
Door Adjustment ............................................ 1-4
Installing Splashguard Brackets ....................... 1-4
Joining ......................................................... 1-4
Joining Instructions ....................................... 1-5
Installing Bumpers ........................................ 1-17
ELECTRICAL / CONTROLLER /
WATER / REFRIGERATION
Electrical ....................................................... 2-1
Merchandiser Electrical Data ........................... 2-1
Field Wiring .................................................. 2-1
Main Disconnect Switch .................................. 2-1
Plug ............................................................. 2-2
Case Electronic Controller .............................. 2-3
Connecting Device ....................................... 2-10
Controller Troubleshooting ............................2-12
Water - (For Condensers) ................................2-13
Pre-Installation System Cleaning ................... 2-15
Refrigeration ............................................... 2-16
Condensing Unit Access ................................ 2-16
Defrost ........................................................ 2-17
DRIP PIPING AND SPLASHGUARDS
Waste Outlet and Water Seal ............................ 3-1
Installing Drip Piping ..................................... 3-1
Drip Piping Lineup Arrangements ................... 3-4
Installing Splashguards ................................... 3-5
Sealing Splashguard to Floor ........................... 3-6
START UP / OPERATION
Prior to Start-up Check List ............................ 4-1
12 Hours After Startup Checklist ....................... 4-2
Startup and Operation ...................................... 4-3
Stocking ........................................................ 4-3
Load Limits .................................................... 4-3
Installing FDA/NSF Required Thermometer ...... 4-5
MAINTENANCE
Care and Cleaning ............................................ 5-1
Cleaning Honeycomb Assemblies ........................ 5-2
Cleaning Stainless Steel Surfaces .........................5-3
Cleaning Coils ..................................................5-3
Cleaning Under Merchandisers ......................... 5-3
Removing Scratches from Bumper ...................... 5-3
SERVICE
Replacing Fan Motors and Blades ...................... 6-1
Replacing Electric Defrost Heaters .................... 6-2
Replacing Drain Pan Heater ............................. 6-3
Servicing Vertical Lighting .............................. 6-4
Servicing Doors and Frames ............................. 6-4
Replacing Door or Door Frame Parts ................ 6-4
Replacing Damaged Drain Fitting ..................... 6-4
Repairing Aluminum Coils ............................... 6-5
WARRANTY
vi
P/N 3053328_C
U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • WWW.HUSSMANN.COM