9 SHOCK ABSORBER, SWINGARM
9.14
58
Disassembling the dam�er
-0
I
Preparatory work
- Remove the spring. (
�
p. 57)
Main work
- Note down the current state of rebound damping
O
and
compression damping
8.
- Completely open the adjusters of the rebound and compres
sion damping.
- Remove rubber cap
8
of the reservoir.
- Open screw
8
slowly.
✓ The pressurized nitrogen escapes.
- Remove locking cap
0.
- Press in seal ring retainer (3 using the special tool.
I Pressing tool (T1216) (
lll:!l
p. 323)
- Remove lock ring@.
Info
Do not scratch the inner surface.
Summary of Contents for FE 450 2014
Page 1: ...PIONEERING SINCE 1903 REPAIR MANUAL2014 FE 450 FE 501 Art no 3403003en Husqvarna MOTORCYCLES ...
Page 2: ......
Page 82: ...9 SHOCK ABSORBER SWINGARM 80 Remove the motorcycle from the lift stand p 12 ...
Page 263: ...28 SERVICE SCHEDULE 261 ...
Page 328: ...32 SPECIAL TOOLS Filling tool 2x 3x Art no T170S1 T170S1 H00855 01 326 ...
Page 336: ...INDEX Page 6 of 8 272 288 Page 7 of 8 274 290 Page 8 of 8 276 292 Work rules 8 334 ...