18 ENGINE
18.4.37 Disassembling the main shaft
Oo
-
Secure the main shaft with the toothed end facing downward in the vise.
Guideline
I
Use soft jaws.
-
Remove stop disk
O
and 2nd-gear fixed gear
8.
-
Remove 6th-gear idler gear (D.
-
Remove the split needle bearing
8
and stop disk @t.
-
Remove lock ring (D.
-
Remove 3rd/4th-gear sliding gear@.
-
Remove lock ring
fD.
-
Remove stop disk
0
and 5th-gear idler gear�-
-
Remove split needle bearing
48.
18.4.38 Assembling the main shaft
Info
Use new lock rings with every repair.
Preparatory work
-
Lubricate all parts carefully before assembling.
-
Check the transmission. (
�
p. 203)
200
304684-10
Summary of Contents for FE 450 2014
Page 1: ...PIONEERING SINCE 1903 REPAIR MANUAL2014 FE 450 FE 501 Art no 3403003en Husqvarna MOTORCYCLES ...
Page 2: ......
Page 82: ...9 SHOCK ABSORBER SWINGARM 80 Remove the motorcycle from the lift stand p 12 ...
Page 263: ...28 SERVICE SCHEDULE 261 ...
Page 328: ...32 SPECIAL TOOLS Filling tool 2x 3x Art no T170S1 T170S1 H00855 01 326 ...
Page 336: ...INDEX Page 6 of 8 272 288 Page 7 of 8 274 290 Page 8 of 8 276 292 Work rules 8 334 ...