STS-6000K-H1 Smart Transformer Station (Vietnam,
Duc Long Gai Lai)
Installation Guide
5 Operating Components
Issue 02 (2020-02-21)
Copyright © Huawei Technologies Co., Ltd.
38
Step 9
Ensure that the PE cable is securely connected to the maintenance compartment door of the
dehydrating breather, and close the maintenance compartment door.
Avoid damaging the PE cable when closing the maintenance compartment door.
Figure 5-13
Installing cables in the maintenance compartment
----End
5.5 Operating an Oil Surface Thermometer
Step 1
Rotate the cover counterclockwise to remove the glass cover.