STS-6000K-H1 Smart Transformer Station (Vietnam,
Duc Long Gai Lai)
Installation Guide
3 Equipment Installation
Issue 02 (2020-02-21)
Copyright © Huawei Technologies Co., Ltd.
20
Before hoisting, ensure that the crane and hoisting ropes meet the load-bearing
requirements.
When installing or removing the hoisting equipment, do not drag it on the container to
prevent scratches.
Before installing the equipment, check the container for damage, such as holes and cracks,
and check the equipment model. If the appearance is abnormal or the equipment model is
incorrect, contact your dealer.
Table 3-1
Parameters for hoisting the container
Model
Packed Weight
Steel Rope Length Steel Rope
Quantity
STS-6000K-H1
< 23 t
> 6.5 m
4 PCS
Hoisting Precautions
Stage
Precautions
Before hoisting
Ensure that the crane can hoist a load heavier than 50 t, and the
working radius is not less than 10 m. If the onsite environment does
not meet the required working conditions, ask a professional to
assess the conditions.
Only trained and qualified personnel should perform hoisting
operations.
Check that hoisting tools are available and in good condition.
Ensure that the hoisting tools are secured to a load-bearing object or
wall.
The weather condition should be good without wind when the
container needs to be hoisted outdoors.
Ensure that the crane and steel hoisting ropes provide the required
bearing capacity.
All doors of the container should be locked.
Ensure that steel cables are securely connected.
It is recommended that the container be hoisted from left to right or
from right to left to ensure successful hoisting.
During hoisting
Do not allow any unauthorized person to enter the hazardous areas
and never stand under the crane arm.
Ensure that the crane is properly located and avoid long-distance
hoisting.
Ensure that the container is stable and the diagonal gradient of the