STS-6000K-H1 Smart Transformer Station (Vietnam,
Duc Long Gai Lai)
Installation Guide
3 Equipment Installation
Issue 02 (2020-02-21)
Copyright © Huawei Technologies Co., Ltd.
23
Figure 3-2
Leveling the container
----End
3.4 Hoisting Verification
No. Check Item
Acceptance Criteria
1
Deliverables
Check whether the deliverables are complete, whether any
screw is loose, and whether there is any visible external
damage. If any component is missing, any screw is loose,
or any damage is found, contact your dealer.
NOTE
For details about the supplied number of accessories, see the
packing list.
The documents delivered with the product are important and
should be kept properly.
2
Container door
All container doors can be smoothly opened and closed.
3
Container enclosure
The container enclosure is not deformed or cracked.
3.5 Securing a Container
Step 1
Secure a container.
There are four mounting holes where angle steel brackets contact the base. Mark all mounting holes.
Each angle steel bracket must be secured by two mounting holes. Preferentially drill the outer two
mounting holes. If steel bars in a concrete base block the drill bit, drill the inner mounting holes.
Ensure that the expansion bolts are tightened when securing the angle steel to the base.