STS-6000K-H1 Smart Transformer Station (Vietnam,
Duc Long Gai Lai)
Installation Guide
5 Operating Components
Issue 02 (2020-02-21)
Copyright © Huawei Technologies Co., Ltd.
37
Figure 5-11
Adjusting the dehydrating breather
Step 6
Install a protective earthing (PE) cable for the dehydrating breather. Apply silica gel or paint
on the ground terminal to protect it against corrosion.
Figure 5-12
Installing a PE cable
Step 7
Open the maintenance compartment door of the dehydrating breather.
Step 8
Install cables in the maintenance compartment of the dehydrating breather.