2.
Choose
Provisioning
>
Mapping View
, and choose the mapping view that the host
group which holds the application servers belongs to. Then click
Create
to add the
newly created LUN group to this mapping view.
NOTE
To check on a standby server whether data replication succeeds, you need to mount the secondary LUN to the
standby server. Before mounting the secondary LUN, split the LUN and set
Status of Secondary Resource
Protection
to
Read/Write
.
Step 2
Check whether data replication succeeded.
1.
Log in to the application server at the primary site and write file X.txt to the primary
LUN. When
Pair Running Status
is
Normal
, go to the next step.
2.
Wait 10 to 20 minutes. Then log in to the standby server at the secondary site to check
whether data file X.txt exists on the secondary LUN.
–
If yes, data replication succeeded.
–
If no, log in to the DeviceManager at site A, select
Data Protection
>
Remote
Replication
>
Remote Replication Pair
. Click the remote replication, and choose
More
>
Synchronize
to synchronize data manually.
Step 3
Check whether a primary/secondary switchover can be performed on the secondary site.
1.
Log in to DeviceManager at the secondary site. Choose
Data Protection
>
Remote
Replication
>
Remote Replication Pair
and perform the following operations.
a.
Select the remote replication pair to be split and choose
More
>
Split
.
b.
Click
Properties
. Modify
Status of secondary resource protection
to
Read/Write
to set the secondary LUN to readable and writable.
c.
Choose
More
>
Primary/Secondary Switchover
to switch the secondary LUN to
the primary LUN.
2.
Log in to the standby server at the secondary site and write file Y.txt to the new primary
LUN. Check whether the primary LUN is readable and writable.
–
If yes, a primary/secondary switchover can be performed on the secondary site.
–
If no, a primary/secondary switchover cannot be performed on the secondary site.
Check whether an alarm about remote replication exists on DeviceManager at the
primary and secondary sites. If yes, solve the fault based on the alarm information
and repeat the previous operations. If no, contact technical support engineers.
Step 4
Check whether data can be recovered.
1.
Log in to DeviceManager at the secondary site, choose
Data Protection
>
Remote
Replication
>
Remote Replication Pair
, and perform the following operations.
a.
Select the remote replication task for which you want to enable secondary resource
protection and then
Properties
. Modify
Status of secondary resource protection
to
Read-only
to set the secondary LUN to read-only.
b.
Click the remote replication task to be synchronized. Choose
More
>
Synchronize
to perform the synchronization manually.
2.
After the synchronization is complete, log in to the application server at the primary site
to check whether file Y.txt exists on the secondary LUN (after the primary/secondary
switchover).
–
If yes, data can be recovered.
OceanStor V3 Series
Remote Replication Feature Guide for Block
4 Configuration Example
Issue 06 (2018-01-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
93