WenZhou ZhengBang Electronic Equipment Co., Ltd
ZB4050LS Rev 1.1
21
6.
Material Station Allocation
:
Click the "Assignment Station" to provide 3 important data based on the contents of the file.
A. Synchronize the component parameters to the feeder settings.
B. Recommend the best feeder installation location.
C. Mentioned which types of nozzles are used.
Fig.4-21 Material Station Allocation
Fig.4-22 Location Recommendation
7
.Material Installation
:
Install the component-mounted feeder onto the patch according to the station's recommended station
installation serial number.
8.Optimization:
Calculate the optimal placement order based on component picking and placement.
Fig.4-23 Optimization