WenZhou ZhengBang Electronic Equipment Co., Ltd
ZB4050LS Rev 1.1
35
1.Click “Jump” and input PCB NO. and component NO.
2.Then refer to normal production and single step production to operate.
Jump to specified component location of PCB and take it as the starting placement position for this production automatically.
3.Production completed or click “Stop” to return to normal production mode.
Fig.5-5 Jump Production
!
Attention
:
The placement mode must be adjusted to the sequential placement mode when using jump production, and
the jump function cannot be used in the independent placement mode.
5-2-4 Trial Production
Trial Production is mainly for machine warm-up and operation training.
Click the “empty”, the system will automatically start to complete the Mark calibration, and not pick up the component placement until
the program is installed.
In the middle, you can click the "pause" and "stop" to terminate the operation.
5-3 Feed Production
The system supports specified feeder and component feeding.
5-3-1 Specified Feeder Feed
1.Import the production program, click “Match” system to match the parameters automatically.
2.Click the “Feeder” in the title to clear all feeder parameters.