Procedure
1.
Power down the server.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Do one of the following:
• Extend the server from the rack.
• Remove the server from the rack.
4.
Remove the access panel.
5.
Remove the air baffle.
6.
Remove the fan cage.
7.
Install the energy pack option.
8.
Route and connect the cable.
CAUTION: Do not connect the energy pack while the server is operating. Verify that all power to the server has
been removed.
Hardware options installation
75
Summary of Contents for ProLiant DL380 Gen10
Page 33: ...Component identification 33...
Page 58: ...Operations 58...
Page 124: ...7 Install the rear blank from the option kit Hardware options installation 124...
Page 163: ...Box 1 to SAS Expander Box 2 to SAS Expander Cabling 163...
Page 165: ...Box 1 Box 2 Cabling 165...
Page 167: ...Cable routing Midplane 4LFF drive option Cabling 167...
Page 173: ...Cabling 173...