
4.2 Installing SAS, SATA, or solid state drives
4.3 Installing the SFF flash adapter option
4.4 Installing the M.2 SSD flash drive and adapter board
4.5 Installing the controller option
4.6 Installing mezzanine card options
4.7 Installing the P416ie-m Controller mezzanine option
4.9 HPE Smart Storage Hybrid Capacitor
4.9.1 Minimum firmware versions
4.9.2 Installing the energy pack option
4.10 Memory options
4.10.1 DIMM and NVDIMM population information
4.10.2 DIMM-processor compatibility
4.10.3 HPE SmartMemory speed information
4.10.4 Installing a DIMM
4.10.5 HPE 16GB NVDIMM option
4.10.5.1 Server requirements for NVDIMM support
4.10.5.2 Installing an NVDIMM
4.10.5.3 Configuring the compute module for NVDIMMs
4.10.5.4 NVDIMM sanitization
4.10.5.5 NVDIMM relocation guidelines
4.10.6 Intel Optane persistent memory 100 series for HPE
4.10.6.1 Persistent memory module-processor compatibility
4.10.6.2 Persistent memory module population information
4.10.6.3 System requirements for persistent memory module support
4.10.6.4 Installing persistent memory modules
4.10.6.5 Configuring the compute module for Intel Optane persistent memory 100 series for HPE
4.10.6.6 Persistent memory module relocation guidelines
4.10.6.7 Migrating a persistent memory module
4.11 Installing the processor heatsink option
4.12 HPE Trusted Platform Module 2.0 Gen10 option
4.12.1 Overview
4.12.2 HPE Trusted Platform Module 2.0 guidelines
4.12.3 Installing and enabling the HPE TPM 2.0 Gen10 option
4.12.3.1 Installing the Trusted Platform Module board
4.12.3.1.1 Preparing the compute module for installation
4.12.3.1.2 Installing the TPM board and cover
4.12.3.1.3 Preparing the compute module for operation
4.12.3.2 Enabling the Trusted Platform Module
4.12.3.2.1 Enabling the Trusted Platform Module as TPM 2.0
4.12.3.2.2 Enabling the Trusted Platform Module as TPM 1.2
4.12.3.3 Retaining the BitLocker recovery key/password
5 Cabling
Summary of Contents for Synergy 480 Gen10
Page 6: ...Component identification Component identification 6 ...
Page 10: ...Front panel LEDs and buttons 10 ...
Page 15: ...Smart Carrier NVMe SCN drive LED definitions 15 ...
Page 32: ...Operations Operations 32 ...
Page 45: ...Setup Setup 45 ...
Page 90: ...HPE Trusted Platform Module 2 0 Gen10 option HPE Trusted Platform Module 2 0 Gen10 option 90 ...
Page 94: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 94 ...
Page 97: ...4 Proceed to Preparing the compute module for operation Installing the TPM board and cover 97 ...
Page 103: ...Cabling Cabling 103 ...
Page 105: ...Energy pack option cabling Energy pack option cabling 105 ...
Page 108: ...Electrostatic discharge Electrostatic discharge 108 ...
Page 111: ...Specifications Specifications 111 ...
Page 118: ...Support and other resources Support and other resources 118 ...