Preparing the
Preparing the compute module
compute module for operation
for operation
Procedure
Procedure
1. Install any options or cables previously removed to access the TPM connector.
2. Install the access panel.
3. Do one of the following:
Slide or install the server into the rack.
Install the compute module into the frame.
4. Power up the compute module.
a. Connect the power cords (rack and tower servers).
b. Press the Power On/Standby button.
Preparing the compute module for operation
98
Summary of Contents for Synergy 480 Gen10
Page 6: ...Component identification Component identification 6 ...
Page 10: ...Front panel LEDs and buttons 10 ...
Page 15: ...Smart Carrier NVMe SCN drive LED definitions 15 ...
Page 32: ...Operations Operations 32 ...
Page 45: ...Setup Setup 45 ...
Page 90: ...HPE Trusted Platform Module 2 0 Gen10 option HPE Trusted Platform Module 2 0 Gen10 option 90 ...
Page 94: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 94 ...
Page 97: ...4 Proceed to Preparing the compute module for operation Installing the TPM board and cover 97 ...
Page 103: ...Cabling Cabling 103 ...
Page 105: ...Energy pack option cabling Energy pack option cabling 105 ...
Page 108: ...Electrostatic discharge Electrostatic discharge 108 ...
Page 111: ...Specifications Specifications 111 ...
Page 118: ...Support and other resources Support and other resources 118 ...