
Powering down the compute module
Powering down the compute module
Before powering down the compute module for any upgrade or maintenance procedures, perform a backup of the system and all data.
Then, shut down, as appropriate, applications and operating systems. A successful shutdown is indicated by the system power LED
displaying amber.
IMPORTANT:
IMPORTANT:
Always attempt a graceful shutdown before forcing a nongraceful shutdown. Application data can be lost when
performing a nongraceful shutdown of applications and the OS.
Before proceeding, verify the following:
The compute module is in standby mode by observing that the system power LED is amber.
The UID LED is not flashing blue.
NOTE:
NOTE:
When the compute module is in standby mode, auxiliary power is still being provided to the system.
If the UID LED is flashing blue, a remote session, or a firmware update is in progress.
To power down the compute module, use one of the following methods:
To perform a graceful shutdown of applications and the OS when powering down the compute module to standby mode, do one of
the following:
Press and release the Power On/Standby button.
Select the Momentary press power off selection in HPE OneView.
Select the Momentary press virtual power button selection in HPE iLO.
If a graceful shutdown fails to power down the compute module to standby mode when an application or OS stops responding, force
a nongraceful shutdown of applications and the OS. Do one of the following:
Press and hold the Power On/Standby button for more than four seconds.
Select the Press and hold power off selection in HPE OneView.
Select the Press and hold virtual power button selection in HPE iLO.
Powering down the compute module
34
Summary of Contents for Synergy 480 Gen10
Page 6: ...Component identification Component identification 6 ...
Page 10: ...Front panel LEDs and buttons 10 ...
Page 15: ...Smart Carrier NVMe SCN drive LED definitions 15 ...
Page 32: ...Operations Operations 32 ...
Page 45: ...Setup Setup 45 ...
Page 90: ...HPE Trusted Platform Module 2 0 Gen10 option HPE Trusted Platform Module 2 0 Gen10 option 90 ...
Page 94: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 94 ...
Page 97: ...4 Proceed to Preparing the compute module for operation Installing the TPM board and cover 97 ...
Page 103: ...Cabling Cabling 103 ...
Page 105: ...Energy pack option cabling Energy pack option cabling 105 ...
Page 108: ...Electrostatic discharge Electrostatic discharge 108 ...
Page 111: ...Specifications Specifications 111 ...
Page 118: ...Support and other resources Support and other resources 118 ...