
Installing
Installing persistent memory modules
persistent memory modules
IMPORTANT:
IMPORTANT:
Hewlett Packard Enterprise recommends that you implement best-practice configurations such as clustered
configurations for high availability (HA).
Use this procedure only for new persistent memory module installations. If you are migrating this persistent memory module from
another compute module, see the Intel Optane persistent memory 100 series for HPE User Guide on the Hewlett Packard Enterprise
website (https://www.hpe.com/info/persistentmemory-docs
https://www.hpe.com/info/persistentmemory-docs).
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
The components included with the hardware option kit
A T-10 Torx screwdriver might be needed to unlock the access panel.
Before beginning the installation, review the memory population guidelines on the Hewlett Packard Enterprise website
(https://www.hpe.com/docs/memory-population-rules
https://www.hpe.com/docs/memory-population-rules).
Procedure
Procedure
1. Observe the following alerts:
CAUTION:
CAUTION:
DIMMs are keyed for proper alignment. Align notches in the DIMM with the corresponding notches in the DIMM slot
before inserting the DIMM. Do not force the DIMM into the slot. When installed properly, not all DIMMs will face in
the same direction.
CAUTION:
CAUTION:
Electrostatic discharge can damage electronic components. Be sure you are properly grounded before beginning this
procedure.
CAUTION:
CAUTION:
Failure to properly handle DIMMs can damage the DIMM components and the system board connector. For more
information, see the DIMM handling guidelines in the troubleshooting guide for your product on the Hewlett Packard
Enterprise website:
HPE ProLiant Gen10 (https://www.hpe.com/info/gen10-troubleshooting
https://www.hpe.com/info/gen10-troubleshooting)
HPE Synergy (https://www.hpe.com/info/synergy-troubleshooting
https://www.hpe.com/info/synergy-troubleshooting)
2. Power down the compute module.
a. Shut down the OS as directed by the OS documentation.
b. To place the compute module in standby mode, press the Power On/Standby button. When the compute module enters standby
power mode, the system power LED changes to amber.
c. Disconnect the power cords (rack and tower servers).
3. Remove the compute module from the frame
4. Place the compute module on a flat, level work surface.
6. Remove all components necessary to access the DIMM slots.
7. Install the persistent memory module.
Installing persistent memory modules
81
Summary of Contents for Synergy 480 Gen10
Page 6: ...Component identification Component identification 6 ...
Page 10: ...Front panel LEDs and buttons 10 ...
Page 15: ...Smart Carrier NVMe SCN drive LED definitions 15 ...
Page 32: ...Operations Operations 32 ...
Page 45: ...Setup Setup 45 ...
Page 90: ...HPE Trusted Platform Module 2 0 Gen10 option HPE Trusted Platform Module 2 0 Gen10 option 90 ...
Page 94: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 94 ...
Page 97: ...4 Proceed to Preparing the compute module for operation Installing the TPM board and cover 97 ...
Page 103: ...Cabling Cabling 103 ...
Page 105: ...Energy pack option cabling Energy pack option cabling 105 ...
Page 108: ...Electrostatic discharge Electrostatic discharge 108 ...
Page 111: ...Specifications Specifications 111 ...
Page 118: ...Support and other resources Support and other resources 118 ...