41
Core Switch 2/64 and SAN Director 2/128 installation guide
4.
Use the lift device to raise the chassis until the bottom of the chassis is level with the
shelf-like surfaces of the rack mount shelf brackets.
5.
Slide the chassis onto the two rack mount shelf brackets.
Securing the chassis to the rails
1.
Attach the two flat upper rack mount brackets (that you installed on the chassis earlier) to
the two L-shaped brackets installed onto the rack rails. Use the two screws set aside in
step 1
of ”
Attaching the upper rack mount bracket assemblies to the chassis
” on page 38.
See
Figure 9
.
Figure 9
Attaching the upper rack mount bracket to the L-shaped brackets
2.
Tighten screws, and torque to 32 inch-pounds.
SHR-2513A
Summary of Contents for StorageWorks 2/64 - Core Switch
Page 8: ...Contents 8 ...
Page 24: ...Overview 24 ...
Page 130: ...Setting up and installing modems 130 ...
Page 134: ...Running routine operations 134 ...
Page 166: ...Index 166 ...