39
Core Switch 2/64 and SAN Director 2/128 installation guide
Figure 7
Attaching the left and right flat upper rack mount brackets
4.
Tighten the screws and torque to 32 inch-pounds.
5.
Attach the two L-shaped brackets to the rack rails farthest from the service aisle. See
Figure 8
.
• For rails with square holes:
Attach the two L-shaped brackets to the rack rails with two of the #1/4-20 x 1/2 inch
Phillips panhead screws and two square washers per bracket. Tighten the screws to a
torque of 80 inch-pounds.
• For rails with round holes:
Attach the two L-shaped brackets to the rack rails using two of the #1/4-20 x 1/2 inch
Phillips panhead screws per bracket. Tighten the screws to a torque of 80 inch-pounds.
6.
Route any cables or cords through the rack or along any other route that will be difficult to
reach after the chassis is installed. Leave enough cable allowance to plug and unplug
cables from switch.
1
Left flat upper rack mount bracket
2
#10-32 x 5/16 inch screws (4)
3
Detached L-shaped brackets (1 of 2)
4
Right flat upper rack mount bracket
SHR-2511A
1
2
3
4
Summary of Contents for StorageWorks 2/64 - Core Switch
Page 8: ...Contents 8 ...
Page 24: ...Overview 24 ...
Page 130: ...Setting up and installing modems 130 ...
Page 134: ...Running routine operations 134 ...
Page 166: ...Index 166 ...