Hardware options installation 66
10.
Using a T-15 Torx screwdriver, install the locking brackets.
11.
Connect the drive cage bay 3 power cable (BP3) to the two-bay LFF drive cage backplane.
12.
Connect the two-bay LFF drive cage to one of the following:
o
A six-bay LFF backplane. See step 13.
o
An optional SAS controller. See step 14.
13.
Connect the SAS/SATA controller cable:
a.
Connect the "6LFF" labeled connector to SAS connector 5-6 on the six-bay LFF backplane.
b.
Connect the "2LFF" labeled connector to the two-bay LFF drive cage backplane.
Summary of Contents for ProLiant DL370
Page 1: ...HP ProLiant DL ML370 G6 Server User Guide Part Number 513482 001 March 2009 First Edition ...
Page 16: ...Component identification 16 SFF hard drives LFF hard drives ...
Page 29: ...Operations 29 6 Remove the hard drive cage blank ...
Page 94: ...Cabling 94 Drive cage bay 2 Drive cage bay 3 ...
Page 95: ...Cabling 95 Six bay LFF backplane cabling Drive cage bay 1 Drive cage bay 2 ...
Page 97: ...Cabling 97 Battery cabling for BBWC DVD ROM drive cabling ...
Page 98: ...Cabling 98 Slimline optical drive cabling ...
Page 123: ...Troubleshooting 123 ...
Page 146: ...Technical support 146 ...
Page 147: ...Technical support 147 ...