Hardware options installation 35
10.
Install the access panel (on page
20
).
11.
Install the server into the rack ("
Installing the server into the rack
" on page
27
).
12.
Install the drives ("
Installing a hot-plug drive
" on page
32
).
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless
all bays are populated with either a component or a blank.
13.
Power up the server (on page
17
).
Mini-SAS cable option
The Mini-SAS cables in this option kit support the following drive configurations:
Drive configuration
HP Smart Array RAID Controller Expansion slot
Mini-SAS cable
Four-bay LFF
H220 or P420
Full height or low
profile
800 mm
Four-bay LFF
H222 or P222
Full height or low
profile
890 mm
Eight-bay SFF
P822
Full height
615 mm and 800 mm
Eight-bay SFF
H220 or P420
Low profile
615 mm and 800 mm
To connect the cable option:
1.
Power down the server (on page
17
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
o
Extend the server from the rack (on page
17
).
o
Remove the server from the rack (on page
18
).
4.
Remove the access panel (on page
19
).
5.
Remove the PCI riser cage (on page
20
).
6.
Install the storage controller ("
Installing a storage controller
" on page
38
).
7.
Connect the common end of the Mini-SAS cable to the controller option.
8.
Install the PCI riser cage (on page
21
).
9.
Route the Mini-SAS cable along the side of the system board towards the front chassis, and then connect
the cable to the drive backplane.
Summary of Contents for ProLiant DL360e Gen8
Page 6: ...Contents 6 ...
Page 16: ...Component identification 16 Fan locations ...
Page 78: ...Cabling 78 GPU power cabling ...
Page 106: ...Support and other resources 106 ...
Page 107: ...Support and other resources 107 ...