Hardware options installation 48
o
Remove the server from the rack (on page
22
).
4.
If installed, remove the security bezel ("
Remove the security bezel (optional)
" on page
23
).
5.
Remove the access panel (on page
24
).
6.
Use a T-10 Torx screwdriver to remove the box 2 SFF drive cage blank screws, and then remove the
blank.
Retain the blank for future use.
7.
Install the SFF hot-plug drive cage.
8.
Connect the power cable to the new 8-bay SFF hot-plug drive cage:
a.
Secure the power cable in the left front chassis cable clip.