Hardware options installation 36
5.
Press the knockout.
6.
To remove the knockout from the chassis, twist and pull it.
7.
Using a T-15 Torx screwdriver, install the dedicated iLO management port module.
8.
Install the air baffle (on page
20
).
9.
Install the access panel (on page
18
).
10.
Install the server into the rack ("
Installing the server into the rack
" on page
25
).
11.
Power up the server (on page
17
).
Expansion board option
To install the component:
1.
Power down the server (on page
17
).
2.
Remove the server from the rack (on page
17
).
Summary of Contents for ProLiant DL120 G7
Page 21: ...Operations 21 2 Install the access panel on page 18 3 Power up the server on page 17 ...
Page 41: ...Hardware options installation 41 10 Remove the rear bracket 11 Remove the ATX power supply ...
Page 49: ...Cabling 49 RPS cabling Internal USB cabling ...
Page 51: ...Cabling 51 ODD cabling SATA cabling LFF model ...
Page 52: ...Cabling 52 SFF model SAS cabling LFF model ...
Page 53: ...Cabling 53 SFF model ...
Page 74: ...Troubleshooting 74 ...
Page 97: ...Support and other resources 97 ...