Hardware options installation 43
o
Foam air baffle for an eight-bay SFF drive cage
19.
Install the access panel (on page
18
).
20.
Install the server into the rack ("
Installing the server into the rack
" on page
25
).
21.
Depending on the configuration, install either two power supplies, or one power supply blank and one
power supply.
o
Power supply blank
Summary of Contents for ProLiant DL120 G7
Page 21: ...Operations 21 2 Install the access panel on page 18 3 Power up the server on page 17 ...
Page 41: ...Hardware options installation 41 10 Remove the rear bracket 11 Remove the ATX power supply ...
Page 49: ...Cabling 49 RPS cabling Internal USB cabling ...
Page 51: ...Cabling 51 ODD cabling SATA cabling LFF model ...
Page 52: ...Cabling 52 SFF model SAS cabling LFF model ...
Page 53: ...Cabling 53 SFF model ...
Page 74: ...Troubleshooting 74 ...
Page 97: ...Support and other resources 97 ...