4. Align the rear tie-down with the holes on the rear caster plate.
5. Insert the four spring clips, and then partially tighten four bolts with washers, securing the rear tie-down to the rear caster
plate.
6. Tighten the bolts from steps 3 and 5.
7. Secure the rack to the floor.
Securing the rack to the floor
The following illustration indicates where to drill the holes to secure the rack to the floor. The distances are measured from the
holes on the tie-downs. Have your building structural engineer drill the holes. After your holes have been drilled, insert a bolt
with a washer into each hole to secure the rack to the floor.
600 mm rack
Universal Rack Tie-down kit
73
Summary of Contents for G2 Series
Page 16: ...Ballast kit 16 ...
Page 19: ...5 Re attach the front and rear doors Baying kits 19 ...
Page 26: ...Cable Management Combo kit 26 ...
Page 29: ...Rack Roof Mount Fan kit 29 ...
Page 42: ...Hook and Loop Cabling Strap Clip kit 42 ...
Page 43: ...Hook and Loop Cabling Strap Clip kit 43 ...
Page 45: ...4 Bundle rack cables as required 1 4 Turn Hook and Loop Cabling Strap kit 45 ...
Page 57: ...Server Utility Shelf kit 57 ...
Page 65: ...Side Panel kit 65 ...
Page 68: ...5 Tighten the bolts from steps 2 and 4 Stabilizer kit 68 ...