Universal Rack Tie-down kit
Kit overview
The Rack Tie-Down kit enables you to secure the racks to the floor.
Kit contents (Q9V01A)
Item
Quantity
Front tie-down bracket
2
Rear tie-down bracket
1
M8 x 20-mm bolt
4
M8 x 22-mm bolt
4
M8 flat washer
8
M8 spring clip
4
Required tools
The following tools are required for installation:
• Ratchet with sockets
• Adjustable wrench
Installing the Universal Rack Tie-down kit
Procedure
1. Adjust the leveling feet on the rack so that the full weight of the rack rests on the leveling feet.
2. Align the front tie-down brackets with the holes on the front caster plate.
3. Insert and partially tighten four bolts with washers, securing the front tie-down brackets to the front caster plate.
Universal Rack Tie-down kit
72
Summary of Contents for G2 Series
Page 16: ...Ballast kit 16 ...
Page 19: ...5 Re attach the front and rear doors Baying kits 19 ...
Page 26: ...Cable Management Combo kit 26 ...
Page 29: ...Rack Roof Mount Fan kit 29 ...
Page 42: ...Hook and Loop Cabling Strap Clip kit 42 ...
Page 43: ...Hook and Loop Cabling Strap Clip kit 43 ...
Page 45: ...4 Bundle rack cables as required 1 4 Turn Hook and Loop Cabling Strap kit 45 ...
Page 57: ...Server Utility Shelf kit 57 ...
Page 65: ...Side Panel kit 65 ...
Page 68: ...5 Tighten the bolts from steps 2 and 4 Stabilizer kit 68 ...