3. Place the end of the 15.24-cm (6-inch) grounding strap over the grounding lug on the top side panel.
4. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the top side panel, and then
tighten the washer.
5. Repeat steps 1 through 4 for the other top side panel.
Installing the ground bonding kit on fan kits
Procedure
1. Place one end of a 15.24-cm (6-inch) grounding strap over the grounding lug on the rack top.
2. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the rack top. Then, tighten the
washer.
3. Place the other end of the same grounding strap over the grounding lug on the perforated panel.
4. Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the perforated panel. Then,
tighten the washer.
Ground Bonding kit
40
Summary of Contents for G2 Series
Page 16: ...Ballast kit 16 ...
Page 19: ...5 Re attach the front and rear doors Baying kits 19 ...
Page 26: ...Cable Management Combo kit 26 ...
Page 29: ...Rack Roof Mount Fan kit 29 ...
Page 42: ...Hook and Loop Cabling Strap Clip kit 42 ...
Page 43: ...Hook and Loop Cabling Strap Clip kit 43 ...
Page 45: ...4 Bundle rack cables as required 1 4 Turn Hook and Loop Cabling Strap kit 45 ...
Page 57: ...Server Utility Shelf kit 57 ...
Page 65: ...Side Panel kit 65 ...
Page 68: ...5 Tighten the bolts from steps 2 and 4 Stabilizer kit 68 ...