Starting/Stopping Multiple Emulators
When HP 64700 Card Cages are connected together via the Coordinated
Measurement Bus (CMB), you can start and stop up to 32 emulators at the same
time. These are called synchronous measurements.
This section describes how to:
•
Enable synchronous measurements.
•
Start synchronous measurements.
•
Disable synchronous measurements.
To enable synchronous measurements
•
Enter the specify run command.
You can enable the emulator’s interaction with the CMB by using the specify run
command. When the EXECUTE signal is received, the emulator will run at the
current program counter address or the address specified in the specify run
command.
Note that when the CMB is being actively controlled by another emulator, the step
command does not work correctly. The emulator may end up running in user code
(NOT stepping). Disable CMB interaction (see "To disable synchronous
measurements" below) while stepping the processor.
Note that enabling CMB interaction does not affect the operation of analyzer
cross-triggering.
You can use the specify trace command to specify that an analyzer measurement
begin upon reception of the CMB EXECUTE signal.
The trace measurement defined by the specify trace command will be started when
the EXECUTE signal becomes active. When the trace measurement begins, you
will see the message "CMB execute; emulation trace started".
Chapter 9: Making Coordinated Measurements
Starting/Stopping Multiple Emulators
267
Summary of Contents for 64780A
Page 1: ...Graphical User Interface User s Guide MC68360 68EN360 Emulator Analyzer HP 64780A ...
Page 20: ...xx ...
Page 21: ...Part 1 Quick Start Guide 1 ...
Page 23: ...1 Getting Started 3 ...
Page 45: ...Part 2 Using The Emulator 25 ...
Page 47: ...2 Plugging into a Target System 27 ...
Page 55: ...Chapter 2 Plugging into a Target System Plugging into the Motorola QUADS Target System 35 ...
Page 59: ...3 Starting and Exiting HP 64700 Interfaces 39 ...
Page 69: ...4 Entering Commands 49 ...
Page 103: ...5 Configuring the Emulator 83 ...
Page 122: ...102 ...
Page 123: ...6 Using the Emulator 103 ...
Page 193: ...7 Using the Emulation Bus Analyzer How to record program execution in real time 173 ...
Page 249: ...8 Making Software Performance Measurements 229 ...
Page 279: ...9 Making Coordinated Measurements 259 ...
Page 295: ...Part 3 Reference 275 ...
Page 297: ...10 Setting X Resources 277 ...
Page 312: ...292 ...
Page 313: ...11 Emulator Analyzer Interface Commands 293 ...
Page 391: ...set Chapter 11 Emulator Analyzer Interface Commands set 371 ...
Page 405: ... SYMB Chapter 11 Emulator Analyzer Interface Commands SYMB 385 ...
Page 422: ...402 ...
Page 460: ...440 ...
Page 461: ...Part 4 Concept Guide 441 ...
Page 463: ...13 Concepts of the EMSIM and EMRAM 443 ...
Page 471: ...Part 5 Installation and Service Guide 451 ...
Page 473: ...14 Installation 453 ...
Page 491: ...Chapter 14 Installation Verifying the Installation 471 ...
Page 493: ...15 Installing Updating Emulator Firmware 473 ...
Page 500: ...480 ...
Page 516: ...496 ...
Page 540: ...520 ...