Outer protective tube
¾
Propshafts with sealing ring
Remove the screws on the sealing ring and
remove the sealing ring from the outer pro-
tective tube:
¾
Shorten the inner and outer tube profile by the
same length as the respective protective tube.
¾
Carefully debur the two tube profiles each on
the inside and outside, remove the shavings
and clean the profiles thoroughly.
¾
Propshafts with sealing ring
Scribe the holes for fastening the sealing ring
at a distance of 7 mm from the end of the tube
and drill them. The hole diameter is 6 mm.
7 mm
Ø
6 mm
Dimensions for the holes for fastening the sealing ring
¾
Slide the sealing ring on the profile tube and
fasten it with two screws:
Slide the sealing ring in place
Fasten the sealing ring
¾
Slide the inner protective tube onto the profile tube:
¾
Slide on the safety funnel until it engages:
146
147
Summary of Contents for Leeb 4 AX
Page 2: ......
Page 5: ......
Page 9: ...5...
Page 103: ...Diagram a with example 97...
Page 160: ......