Model IFP-2100/ECS Installation Manual
LS10143-001SK-E
11-17
11.9.0.2 Configuration
1.
The ECS-NVCM Select Switches need to be programmed for network paging.
•
Program the switches to select one or more panels as destination panels.
•
Each switch can only be programmed for either output group activation or network
paging activation.
2.
To use network paging: Cue the microphone and press the Select Switch(es) that correspond to the panel(s)
desired to receive network paging
•
Only one panel can source network paging at a time. The first panel to activate net
-
work paging is the source until that panel discontinues use of network paging
3.
The panel that is the Network Paging source will continue to play any alarms that are active as long as the
alarm circuits aren't outputting the microphone page
Summary of Contents for IFP-2100
Page 256: ...Cut Along the Dotted Line ...
Page 258: ...Cut Along the Dotted Line ...
Page 260: ...Cut Along the Dotted Line ...
Page 262: ...Cut Along the Dotted Line ...
Page 263: ......