1 - 8
Mounting a CCB01-010BT Charge Base
Mounting a CCB02-100BT Base
The CCB02-100BT Base can be mounted on either a horizontal or vertical surface. The cables can be routed through either the
top or the bottom of the base.
The cables can be routed down through the bottom of the base, securing the cables in the wireways.
The cables can also be routed up through the top of the base, crossing them over and securing the cables in the wireways.
When routing the cables up through the top of the base, be sure to cross the cables over before placing in the wireways. If not,
too much strain is placed on the cable connectors.
8x32 thread
x .39 in. (10mm) deep
2.36 in.
59.84mm
3.35 in.
85.09mm
2.8 in.
72.1mm
Summary of Contents for Granit 1911i
Page 1: ...Xenon 1900 1910 Xenon 1902 1912 Granit 1910i 1911i Area Imaging Scanner User s Guide ...
Page 17: ...CCB02 100BT Base Compliance Label locations ...
Page 18: ......
Page 28: ...x ...
Page 40: ...1 12 ...
Page 90: ...3 28 ...
Page 114: ...4 24 Vertical Bottom to Top Upside Down Vertical Top to Bottom ...
Page 120: ...5 6 ...
Page 184: ...7 50 ...
Page 200: ...9 2 Denmark 8 9 6 Norway 8 9 6 Spain 6 Country Codes ...
Page 202: ...9 4 ...
Page 248: ...13 6 ...
Page 263: ...Programming Chart 0 1 2 3 4 5 6 7 8 9 ...
Page 264: ......