Step 3:
Connecting the Washout assembly. Connect the fixed length plastic “A” arms to
the Swashplate, connect to the two longer pivot studs, if all four are the same length
then any two will do. The next step is to adjust the length of the linkage rod between the
Washout Arm and the Flybar connection point. Turn your radio and receiver back on and
center both sticks. Now adjust the length of the flybar linkage so the washout arms are
level (horizontal), see picture 1. Also make sure your flybar arms and flybar-paddles are
level (horizontal), when adjusting the linkage. After the length is adjusted make sure that
you have free travel in all directions and stick positions. When the Pitch stick is all the
way up it should look like picture 3. As you can see there is still plenty of room for aileron
and elevator travel. Now adjust the Washout Anti-rotation pin height so the pin is still in
the guide slot of the washout base during all travel positions. For the Left/Right Washout
Anti-rotation position, line the attachment point of the plastic washout “A” arm on the
Swashplate up with flybar linkage connection point. The imaginary line between these
points should be vertical.
Now you are almost done, only one set of links left, and the length of those links will be
depending on your desired setup whether it's Aerobatic or normal flying. Please refer to
the Pith travel setup table for this final link length.
Picture 3, Swash Up
Picture 4, Head
Page 92 of 104
Summary of Contents for Gas-Her
Page 1: ...Page 1 of 104 ...
Page 7: ...Page 7 of 104 REQUIRED TOOLS ...
Page 23: ...Page 23 of 104 ...
Page 26: ...Page 26 of 104 ...
Page 29: ...SECTION 2 LOWER FRAMES Bag 2 Page 29 of 104 ...
Page 42: ...Page 42 of 104 ...
Page 47: ...SECTION 3 LANDING GEAR ASSEMBLY Bag 3 Page 47 of 104 ...
Page 50: ...SECTION 4 DRIVING SYSTEM Bag 4 Page 50 of 104 ...
Page 53: ...SECTION 5 TAIL ASSEMBLY Bag 5 Page 53 of 104 ...
Page 58: ...Page 58 of 104 ...
Page 62: ...SECTION 6 CONTROL SYSTEMS Bag 6 Page 62 of 104 ...
Page 64: ...Page 64 of 104 ...
Page 70: ...SECTION 7B ROTOR HEAD PRO VERSION Bag 7 Page 70 of 104 ...
Page 73: ...Note The Blade Holder in the kit may look differently Page 73 of 104 ...
Page 75: ...Note you may have to press the Pitch Arms to get them in the Blade Holders Page 75 of 104 ...
Page 78: ...Page 78 of 104 SECTION 8 LINKAGE RODS AND SETTINGS Bag 8 ...
Page 81: ...Page 81 of 104 ...
Page 82: ...Page 82 of 104 ...
Page 85: ...Page 85 of 104 ...
Page 86: ...Page 86 of 104 ...
Page 96: ...Page 96 of 104 ...