1-5 TAIL TRANSMISSION ASSEMBLY
No
Bag# Description
Qty
1 1
Counter
Gear
1
2
1
Counter Gear Shaft
1
3
1
Counter Gear Lock Pin
1
4 1
M4
E-clip
1
5
1
Counter Gear Bearing Block
2
6
1
Pulley Gear
1
7
HB
M3x3 Set Screw
1
8
*****
JP Weld glue
1
The Bearing Blocks shown may look differently
-Install Counter Gear to Counter Gear Shaft using Counter
Gear Lock Pin (No. 3) and M4 E-clip to secure it. Apply JP
Weld around the Pin.
-Put Counter Gear Bearing Block (the lower) in with the
Flange facing down
-Install Counter Gear Bearing Block (the upper) with the
Flange facing up
-Install Pulley Gear (No. 6)
-Secure Pulley Gear with the M3x3 Set Screw (No. 7)
Note: Counter Gear Bearing Blocks may look differently. Ensure that the Counter Gear Lock Pin
is seated all the way down in the slot in the Counter Gear. If it is not seated it will not allow the
Bearing Block to go to the proper position and will bind on the Pulley or Gear.
Page 18 of 104
Summary of Contents for Gas-Her
Page 1: ...Page 1 of 104 ...
Page 7: ...Page 7 of 104 REQUIRED TOOLS ...
Page 23: ...Page 23 of 104 ...
Page 26: ...Page 26 of 104 ...
Page 29: ...SECTION 2 LOWER FRAMES Bag 2 Page 29 of 104 ...
Page 42: ...Page 42 of 104 ...
Page 47: ...SECTION 3 LANDING GEAR ASSEMBLY Bag 3 Page 47 of 104 ...
Page 50: ...SECTION 4 DRIVING SYSTEM Bag 4 Page 50 of 104 ...
Page 53: ...SECTION 5 TAIL ASSEMBLY Bag 5 Page 53 of 104 ...
Page 58: ...Page 58 of 104 ...
Page 62: ...SECTION 6 CONTROL SYSTEMS Bag 6 Page 62 of 104 ...
Page 64: ...Page 64 of 104 ...
Page 70: ...SECTION 7B ROTOR HEAD PRO VERSION Bag 7 Page 70 of 104 ...
Page 73: ...Note The Blade Holder in the kit may look differently Page 73 of 104 ...
Page 75: ...Note you may have to press the Pitch Arms to get them in the Blade Holders Page 75 of 104 ...
Page 78: ...Page 78 of 104 SECTION 8 LINKAGE RODS AND SETTINGS Bag 8 ...
Page 81: ...Page 81 of 104 ...
Page 82: ...Page 82 of 104 ...
Page 85: ...Page 85 of 104 ...
Page 86: ...Page 86 of 104 ...
Page 96: ...Page 96 of 104 ...