TÜV-A 03 ATEX 0019X
♦
cbr2052a0600p_01
♦
36/23
6. PARAMETERS – DEFINITIONS AND PROGRAMMING
6.1. M
EASUREMENT CONFIGURATION
P00: - c b a Engineering Unit System
Factory default will be reloaded in the corresponding engineering units by programming this parameter. Therefore all parameters have to be set again.
a
Operating mode
0
Always 0
Engineering units
(according to „c”)
b
Metric
US
0
m
ft
1
cm
Inch
c
Calculation system
0
metric
1
US
DEFAULT: 000
Attention: mind the sequence!
When programming this parameter the
right side value “a” will be blinking first.