D-2
Maintenance
10. Repeat steps 7 and 8 until the strip test indicates zero (0) ppm. Refill reagent and DI water containers to 50 ml and 4 L respectively to
ensure sufficient DI water is available to perform rinses. The reagent containers should be refilled after two rinse cycles. The main
container should be refilled after 5 rinse cycles.
11. Once strip testing returns 0 ppm result, perform 2 additional rinses.
Replacing Fuses
Required Tools and Materials
• Flat screwdriver
• Replacement fuses (AC 100-120V T10A 250V; AC 200-240V T7A 250V)
Procedure
1. Turn the main power switch of the AP3600 instrument to the OFF position (0).
FIGURE D-2. AP3600 Main Power Switch
2. Unplug the AC power cord to the AP3600 instrument.
3. Use a flat screwdriver to rotate the fuse box counterclockwise to remove the fuse holder assembly.
FIGURE D-3. AP3600 Fuse Box
4. Pull out and replace the fuse.
OFF Position
Summary of Contents for OPTIGEN AP3600
Page 1: ...OPTIGEN AP3600 AUTOMATED INSTRUMENT USER MANUAL ...
Page 2: ...OPTIGEN AP3600 Automated Instrument UserManual Rx Only ...
Page 6: ...OPTIGEN AP3600 AUTOMATED INSTRUMENT USER MANUAL Glossary E 1 v Table of Contents ...
Page 14: ...1 6 Safety This page intentionally left blank ...
Page 54: ...8 8 Utilities Screen This page intentionally left blank ...
Page 61: ...9 7 System Settings Screen This page intentionally left blank ...
Page 62: ......
Page 66: ...10 4 End of Run This page intentionally left blank ...
Page 82: ...D 4 Maintenance This page intentionally left blank ...