GR2K-GA-1002
liii
Rev. 6.03
Setting the subscribing conditions and configuration defining information of the device .......... 4-53
Configuration Definition on GR2000 for POS in Multivendor Environment ................................... 4-56
NWJ1-8U connection restrictions....................................................................................................... 4-57
ATM Configuration Definition Settings Required with NP200 and NP220 ...................................... 4-61
ATM Configuration Definition Settings Required with AN1000 ....................................................... 4-62
ATM Configuration Definition Settings Required with AN1000 ....................................................... 4-62
Examples of devices in which the HelloInterval value and the Routerdeadinterval are different
with OSPF ............................................................................................................................................. 4-65
List of IPv6 function supports by software processing ................................................................... 4-72
Range of values in VPN-ID .................................................................................................................. 4-90
Contents of the TLV used.................................................................................................................... 4-91
Chapter 5 - Installation Site Conditions ................................................5-1
Temperature and Humidity Requirements........................................................................................... 5-1
Dust Requirements ................................................................................................................................ 5-2
Input Power Requirements—AC Input ................................................................................................. 5-6
Input Power Requirements—DC Input ................................................................................................. 5-6
Requirements for Circuit Breaker on Power Distribution Panel...................................................... 5-10
Receptacle Types for AC Input ........................................................................................................... 5-11
Typical Power Consumption and Heat Dissipation Figures ............................................................ 5-13
Chapter 6 - Hardware Installation ..........................................................6-1
Allowable Style of Installation by Router Model ............................................................................... 6-12
Console specifications ........................................................................................................................ 6-66
Chapter 7 - Starting, Setting Up, and Stopping ....................................7-1
Methods for Router Restart................................................................................................................... 7-2
Chapter 8 - Adding and Removing Components .................................8-1
Chapter 9 - Software Installation and Updates .....................................9-1
Summary of Contents for GR2000 Series
Page 1: ...Hitachi Gigabit Router GR2000 Series GR2K GA 1002 Rev 6 03 Installation Guide ...
Page 26: ...GR2000 Installation Guide xxvi GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 42: ...GR2000 Installation Guide xlii GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 54: ...GR2000 Installation Guide liv GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 102: ...GR2000 Installation Guide 2 46 GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 296: ......
Page 312: ... n upper eft side In upper right side In upper front end ...
Page 314: ......
Page 329: ......
Page 330: ... ...
Page 338: ... Metal bracket accessory of rack 19 inch rack Interface cable Power calbe ...
Page 345: ...19 inch Rack GR2000 10H or GR2000 10 Guide Rail ...
Page 350: ......
Page 351: ...547 95 177 8 1430 133 35 177 8 ...
Page 353: ...19 inch Rack GR2000 20H or GR2000 20 Guide Rail ...
Page 356: ...Metal fittings supplied as accessories M4 screws supplied as accessories NIF side ...
Page 359: ...Connect both power cables if there is a redundant power supply Power Switch I O ...
Page 364: ...Breaker switch I O L N Terminal board Front ...
Page 369: ... Breaker switch I O Front Rear ...
Page 384: ......
Page 386: ... ...
Page 387: ... ...
Page 388: ... Anchor screw Guide rail ...
Page 393: ...2 Follow the instructions illustrated in Figure 8 5 I O DC DC unit power switch ...
Page 395: ...2 Follow the instruction illustrated in Figure 8 7 I O DC DC unit power switch ...
Page 398: ...POW 2 Follow the instructions illustrated in Figure 8 10 Using the latches ...
Page 410: ......