Component Details
GR2K-GA-1002
3-19
Rev. 6.03
3.5.1
NE100-8T, NE100-8TA and NE100-8TB
The NE100-8T, NE100-8TA, and NE100-8TB physically appear as Figure 3-22. These
NIFs each have eight ports for connection with 8-pin modular connectors of RJ-45.
Table 3-16 shows the connector specifications.
Figure 3-22 NE100-8T, NE100-8TA and NE100-8TB Front Panel View
OC-48c/STM-16 (POS) NWOC48-1S
Full size, 30mm wide
2 km
NWOC48-1S4
Full size, 30mm wide
40 km
NWOC48-1S8
Full size, 30mm wide
80 km
NWOC48-1A
Full size, 30mm wide
2km
NWOC48-1A4
Full size, 30mm wide
40km
NWOC48-1A8
Full size, 30mm wide
80km
ATM
OC-3c/STM-1 (ATM)
NAOC3-1M
Half size, 30mm wide
MMF, 2km
OC-3c/STM-1 (ATM)
NAOC3-1S
Half size, 30mm wide
SMF, 15km
25Mbps ATM
NA25M-1
Half size, 30mm wide
90m
OC-12c/STM-4 (ATM)
NAOC12-2M
Full size, 30mm wide
MMF, 500m
OC-12c/STM-4 (ATM)
NAOC12-2S
Full size, 30mm wide
SMF, 15km
NAOC3-8M**
Full size, 30mm wide
2km
NAOC3-8S**
Full size, 30mm wide
15km
*For Japan only
** Product intended for the Japanese market handled only by Hitachi Japan.
Table 3-16 Connector Specifications for NE100-8T, NE100-8TA and NE100-8TB
Pin No.
Specifications
1
Transmit (+) (TA)
2
Transmit (-) (TB)
3
Receive (+) (RA)
4
Unused (UA)
5
Unused (UB)
6
Receive (-) (RB)
7
Unused (UC)
8
Unused (UD)
Note:
Because the interface cable is of twisted-pair type, make TA and TB into a pair, and make RA
and RB into another pair on 10BASE-T; the other pins can be connected to one another without
particular regard to pairing, or can be left open. On 100BASE-TX, additionally make UA and UB into a
pair, and make UC and UD into another pair to cause termination within the NIF.
Table 3-15 NIF Models (continued)
S
TA
T
U
S
NE
10
0-
8T
LNK/ACT:G
LINE ERR:Y
T/R
LINE 0
LINE 1
LINE 2
LINE 3
LINE 4
LINE 5
LINE 6
LINE 7
10BASE-T/100BASE-TX
NE
1
00-
8
T
A
or
Summary of Contents for GR2000 Series
Page 1: ...Hitachi Gigabit Router GR2000 Series GR2K GA 1002 Rev 6 03 Installation Guide ...
Page 26: ...GR2000 Installation Guide xxvi GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 42: ...GR2000 Installation Guide xlii GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 54: ...GR2000 Installation Guide liv GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 102: ...GR2000 Installation Guide 2 46 GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 296: ......
Page 312: ... n upper eft side In upper right side In upper front end ...
Page 314: ......
Page 329: ......
Page 330: ... ...
Page 338: ... Metal bracket accessory of rack 19 inch rack Interface cable Power calbe ...
Page 345: ...19 inch Rack GR2000 10H or GR2000 10 Guide Rail ...
Page 350: ......
Page 351: ...547 95 177 8 1430 133 35 177 8 ...
Page 353: ...19 inch Rack GR2000 20H or GR2000 20 Guide Rail ...
Page 356: ...Metal fittings supplied as accessories M4 screws supplied as accessories NIF side ...
Page 359: ...Connect both power cables if there is a redundant power supply Power Switch I O ...
Page 364: ...Breaker switch I O L N Terminal board Front ...
Page 369: ... Breaker switch I O Front Rear ...
Page 384: ......
Page 386: ... ...
Page 387: ... ...
Page 388: ... Anchor screw Guide rail ...
Page 393: ...2 Follow the instructions illustrated in Figure 8 5 I O DC DC unit power switch ...
Page 395: ...2 Follow the instruction illustrated in Figure 8 7 I O DC DC unit power switch ...
Page 398: ...POW 2 Follow the instructions illustrated in Figure 8 10 Using the latches ...
Page 410: ......