GR2K-GA-1002
xxxv
Rev. 6.03
4.2.12.2 IPv6 function restrictions regarding the routing processing mechanism (RP) mounting
conditions
...................................................................................................................... 4-40
4.2.12.3 Minimum Required Memory ........................................................................................ 4-41
4.2.12.4 Number of NDP Entries............................................................................................... 4-42
4.2.12.5 Number of Interfaces................................................................................................... 4-43
4.2.12.6 Maximum Number of Addresses to be Set in Multi-Home .......................................... 4-43
4.2.12.7 Maximum Number of Tunnel Interfaces to be Set....................................................... 4-44
4.2.12.8 Maximum Number of IPv6 Addresses to be Set ......................................................... 4-44
4.2.12.9 Routing Resource ....................................................................................................... 4-45
4.2.12.10 Relation Between the Number of Route Entries and the Line Speed ....................... 4-46
4.2.12.11 Maximum Number of Dynamic and Static Entries..................................................... 4-46
4.2.13 Tag-VLAN ............................................................................................................................. 4-47
4.2.13.1 Routing Processor Module (RP) and NIF.................................................................... 4-47
4.2.13.2 Number of Tag-VLANs to be Set ................................................................................ 4-47
4.2.13.3 Number of Tag-VLANs to be Set in Multi-Home ......................................................... 4-48
4.2.13.4 COPS function ............................................................................................................ 4-49
4.3 Segmentation/Topology Restrictions .......................................................................................... 4-50
4.3.1 Items to be Prepared .............................................................................................................. 4-50
4.3.2 Network Configuration ............................................................................................................ 4-50
4.4 LAN Networking Restrictions ....................................................................................................... 4-51
4.4.1 10BASE-T/100BASE-TX ........................................................................................................ 4-51
4.4.2 100BASE-FX .......................................................................................................................... 4-51
4.4.3 1000BASE-SX/1000BASE-LX/1000BASE-LH ....................................................................... 4-51
4.4.4 Autonegotiation Connection (Applicable to 10BASE-T/100BASE-TX/1000BASE-SX/
1000BASE-LX/1000BASE-LH) .................................................................................................. 4-51
4.4.5 Flow Control ........................................................................................................................... 4-51
4.4.6 Priority Control and Tagged Virtual LAN ................................................................................ 4-52
4.5 WAN Networking Restrictions ...................................................................................................... 4-52
4.5.1 Required Settings on GR2000 for Connecting Other Devices on PPP .................................. 4-52
4.5.2 Precautions on Frame Relay Network Connection................................................................. 4-52
4.5.2.1 Multivendor Connection Using DLCI Group .................................................................. 4-52
4.5.2.2 Packet Format in Frame Relay Connection .................................................................. 4-52
4.5.2.3 Use of frping Command in Multivendor Environment.................................................... 4-53
4.5.2.4 Conditions When Submitting Application Form to Frame Relay Network ..................... 4-53
4.5.2.5 Packet Length ............................................................................................................... 4-53
4.5.3 Precautions on POS Network Connection.............................................................................. 4-56
4.5.3.1 Required Setting on GR2000 for POS in Multivendor Environment.............................. 4-56
4.5.3.2 Required Setting on Cisco Systems’ Router When Connecting GR2000 on
POS Interface ..................................................................................................................... 4-56
4.5.4 Precautions on J2 Network Connection ................................................................................. 4-56
4.5.5 Cautions regarding PRI circuit connections............................................................................ 4-57
4.5.6 Precautions on serial line connection ..................................................................................... 4-57
4.5.7 Precautions on InverseMax Terminal Adapter Connection .................................................... 4-57
4.6 ATM Networking Restrictions ....................................................................................................... 4-58
4.6.1 Bandwidth Planning Considerations ....................................................................................... 4-58
Summary of Contents for GR2000 Series
Page 1: ...Hitachi Gigabit Router GR2000 Series GR2K GA 1002 Rev 6 03 Installation Guide ...
Page 26: ...GR2000 Installation Guide xxvi GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 42: ...GR2000 Installation Guide xlii GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 54: ...GR2000 Installation Guide liv GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 102: ...GR2000 Installation Guide 2 46 GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 296: ......
Page 312: ... n upper eft side In upper right side In upper front end ...
Page 314: ......
Page 329: ......
Page 330: ... ...
Page 338: ... Metal bracket accessory of rack 19 inch rack Interface cable Power calbe ...
Page 345: ...19 inch Rack GR2000 10H or GR2000 10 Guide Rail ...
Page 350: ......
Page 351: ...547 95 177 8 1430 133 35 177 8 ...
Page 353: ...19 inch Rack GR2000 20H or GR2000 20 Guide Rail ...
Page 356: ...Metal fittings supplied as accessories M4 screws supplied as accessories NIF side ...
Page 359: ...Connect both power cables if there is a redundant power supply Power Switch I O ...
Page 364: ...Breaker switch I O L N Terminal board Front ...
Page 369: ... Breaker switch I O Front Rear ...
Page 384: ......
Page 386: ... ...
Page 387: ... ...
Page 388: ... Anchor screw Guide rail ...
Page 393: ...2 Follow the instructions illustrated in Figure 8 5 I O DC DC unit power switch ...
Page 395: ...2 Follow the instruction illustrated in Figure 8 7 I O DC DC unit power switch ...
Page 398: ...POW 2 Follow the instructions illustrated in Figure 8 10 Using the latches ...
Page 410: ......