the defined VC bandwidth is exceeded, GR2000 discards the excessive amount o
cells as illustrated in Figure 4-10. At this process called shaping, possible loss of l
with the other device may result if a dynamic routing protocol such as RIP or OS
has been used on the subject interface. The reason is because the shaping proce
discards packets regardless of the packet type, thus possibly discarding the cont
packet of the routing protocol. Shown below is an example of RIP being used as t
routing protocol.
When 3 minutes or more have passed since the last transmission of the RIP
control packet to the other device, the route information taking route on the
subject interface is deleted from the routing table of that device, causing link
disconnection with that device.
Reconstruction of the routing table and recovery of the link will take a maxim
of 30 seconds since the shaping process on the own router terminates.
In order to avoid the above-mentioned problem, it is recommended to plan the VC
bandwidth to withstand a possible rise in traffic.
Own router
Summary of Contents for GR2000 Series
Page 1: ...Hitachi Gigabit Router GR2000 Series GR2K GA 1002 Rev 6 03 Installation Guide ...
Page 26: ...GR2000 Installation Guide xxvi GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 42: ...GR2000 Installation Guide xlii GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 54: ...GR2000 Installation Guide liv GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 102: ...GR2000 Installation Guide 2 46 GR2K GA 1002 Rev 6 03 This page left intentionally blank ...
Page 296: ......
Page 312: ... n upper eft side In upper right side In upper front end ...
Page 314: ......
Page 329: ......
Page 330: ... ...
Page 338: ... Metal bracket accessory of rack 19 inch rack Interface cable Power calbe ...
Page 345: ...19 inch Rack GR2000 10H or GR2000 10 Guide Rail ...
Page 350: ......
Page 351: ...547 95 177 8 1430 133 35 177 8 ...
Page 353: ...19 inch Rack GR2000 20H or GR2000 20 Guide Rail ...
Page 356: ...Metal fittings supplied as accessories M4 screws supplied as accessories NIF side ...
Page 359: ...Connect both power cables if there is a redundant power supply Power Switch I O ...
Page 364: ...Breaker switch I O L N Terminal board Front ...
Page 369: ... Breaker switch I O Front Rear ...
Page 384: ......
Page 386: ... ...
Page 387: ... ...
Page 388: ... Anchor screw Guide rail ...
Page 393: ...2 Follow the instructions illustrated in Figure 8 5 I O DC DC unit power switch ...
Page 395: ...2 Follow the instruction illustrated in Figure 8 7 I O DC DC unit power switch ...
Page 398: ...POW 2 Follow the instructions illustrated in Figure 8 10 Using the latches ...
Page 410: ......