
WatchCare™ Incontinence Management System User and Service Manual (196414 REV 2)
49
1.6 Equipment Call Cable Replacement
b.
At the location where the old connector was removed, put the
new
connector into position.
–
Progressa® Bed
—make sure the connector is aligned with
the head-end edge of the UCB box and the connector’s
patient-left side is aligned with the patient-left side of the
UCB box (box without holes) or aligned with the hole in the
box.
UCB box without holes
UCB box with holes
–
VersaCare® Bed
—make
sure the connector is
installed approximately
2" (51 mm) from the
patient-left edge of the
headboard support.
c.
Make sure the connecting pins are away from the bed. Then,
firmly press the
new
connector into position for 10 seconds with
approximately 75 lb (34 kg) of force.
6.
Make a note of the equipment call cable routing from
its connector
to the reader
, and then use the same routing for the
new
equipment
call cable. Remove and install cable ties as necessary.
7.
Near the reader, remove the cable tie(s) that holds the equipment call
cable with the other cables on the bed.
8.
Remove the reader from the bed.
DRAFT 26-FEB-2019
Summary of Contents for WatchCare Series
Page 2: ...DRAFT 26 FEB 2019 ...