293
8.6 SL c
y
cles
FLOOR FINISHING (Cycle 23)
The tool approaches the machining plane smoothly (in a vertically
tangential arc). The tool then clears the finishing allowance remaining
from rough-out.
U
Feed rate for plunging
: Traversing speed of the tool
during penetration
U
Feed rate for milling
Q12: Traversing speed for
milling
Example: NC blocks
60 CYCL DEF 23.0 FLOOR FINISHING
Q11=100 ;FEED RATE FOR PLUNGING
Q12=350 ;FEED RATE FOR MILLING
X
Z
Q11
Q12
The TNC automatically calculates the starting point for
finishing. The starting point depends on the available
space in the pocket.
Summary of Contents for TNC 426
Page 3: ......
Page 4: ......
Page 8: ...IV...
Page 10: ...VI...
Page 26: ......
Page 27: ...1 Introduction...
Page 41: ...2 Manual Operation and Setup...
Page 54: ......
Page 55: ...3 Positioning with Manual Data Input MDI...
Page 59: ...4 Programming Fundamentals of NC File Management Programming Aids Pallet Management...
Page 122: ......
Page 123: ...5 Programming Tools...
Page 153: ...6 Programming Programming Contours...
Page 201: ...7 Programming Miscellaneous functions...
Page 226: ......
Page 227: ...8 Programming Cycles...
Page 366: ......
Page 367: ...9 Programming Subprograms and Program Section Repeats...
Page 381: ...10 Programming Q Parameters...
Page 424: ......
Page 425: ...11 Test run and Program Run...
Page 443: ...12 MOD Functions...
Page 472: ......
Page 473: ...13 Tables and Overviews...
Page 496: ......