4 Planning and installation – HDG hydraulic systems
98
HDG Hydronic
Connection
Connection
Inputs (sensors)
Outputs (units)
F1
not assigned
A1
Heating circuit mixer CCT3
open
H34
F2
Hot water tank
H11 / H12
A2
Heating circuit mixer CCT3
closed
H33
F3
not assigned
A3
Hot water pump
H28
F4
Supply CCT1
H7 / H8
A4
Heating circuit pump CCT1
H27
F5
Supply CCT2
H9 / H10
A5
Heating circuit pump CCT2
H26
F6
not assigned
A6
Heating circuit pump CCT3
H25
F7
not assigned
A7
Heating circuit mixer CCT1
open
H31
F8
not assigned
A8
Heating circuit mixer CCT1
closed
H32
F9
Supply CCT3
H17 / H18
A9
Heating circuit mixer CCT2
open
H29
F10
not assigned
A10
Heating circuit mixer CCT2
closed
H30
No.
Description
Notes
8-01
Select hydraulic system 8
8-03
Heating circuit control settings for use of residual heat
8-04
Set the heating system for heating circuit 1
8-05
Set the heating system for heating circuit 2
8-06
Set the heating system for heating circuit 3
8-07
Option of activating a hot water tank
8-12
Option of activating an additional heating circuit module
8-00
The settings for the hydraulic system have been
completed
Summary of Contents for Pelletmaster 15
Page 1: ...hdg bavaria com HDG Pelletmaster 15 25 Operation Manual V 03 08 2008 ...
Page 2: ......
Page 170: ...170 HDG Pelletmaster 15 25 V 03 en HDG Bavaria GmbH 08 2008 ...
Page 171: ......